There isn't any inconsistency with BSEE selecting to not have to have enchantment bonds on the phase of the get to decommission and BOEM choosing to need them with the stage of economic assurance demands. The BSEE selection is predicated largely on the belief that economical assurance is previously set up by the time it problems decommissioning ord